 |
Planning, building supervision |
 |
- consultancy and co-operation during design, drawing up of documents for tender and award, in accordance with VOB (contracting rules for the award of public works contracts)
- building supervision, also in co-operation with other LGA centres of competence (Geotechnics, Material Testing) checking the qualifications of sub-contractors and staff, proof of in-house and outside monitoring
|
|

Taking a sample for pipe renovation
|
- ensuring quality and efficiency, checking that conditions for quality assured manufacture and delivery of materials are met, including all individual components, work preparation, installation and assembly, dynamic cost comparison calculations in accordance with LAWA (German Federal States' Working Group on Water), taking useful life and real interest rate into account
|
|

Building supervision during pipe renovation with light-hardening pipe lining
 |
- standard specifications (to DIN Beuth) for surface and underground workings, including cleaning, inspection and renovation of waste water sewers and pipes, waste disposal, recycling and removal - data transfer via GAEB (Joint Committee for Electronics in Construction), interfaces DA81 to DA85
- checking descriptions of services (construction descriptions)
- checking specifications.
- independent planning consultancy
Contact
Copyright © 2003-2010 by LGA - All rights reserved. Webmaster - Imprint - Privacy policy Last Updated: 29.10.2010
|
|
EventsEvents and fairs dates affecting our company more |
CertificationThe LGA tests and certifies, but the LGA itself is also certified. more |
|